Completed Projects

Alter A/C Hangar
Hurlburt Field, FL

This project consisted of replacing existing storage mezzanine with higher capacity structural steel frame in order to pour a second level concrete deck. The second level required an additional egress stair to be added to the exterior of the building. Interior convenience steel stairs were also added. Interior overhead doors were replaced with overhead doors that work with new clearances of the 2nd floor.  Interior spaces were redesigned for the tool issue counter with motorized shutter, and removal of existing raised platform. This required openings to the hangar pass through windows to be modified. Additional scopes included Mechanical and Electrical modifications interior, drywall and framing and the addition of a vertical lift platform to move larger items to the 2nd floor.

Design and Install Synthetic Turf Field
Keesler AFB

This design build project included all grade, subgrade, drainage, and installation details required to install a new artificial turf field for Keesler AFB.

Replace Base Perimeter Fence
117th Air Refueling Wing. Birmingham, AL

The purpose of this project was to replace the existing base perimeter fence with a new and taller boundary fence to meet current security force cade. Additionally, a new 1100 LF asphalt perimeter access road was constructed to provide vehicle access through limited terrain on the base.

Repair Lift Station 92420
Hurlburt Field, FL

Upgrade lift station to facilitate additional houses to an on base development. SOW included selective demolition inside lift station, minor cast in place concrete construction, installation of new grinder to manage additional sewage from the new houses.